Solutions   
    Contact Us   
    Your Position: Home > Solutions

    The installation steps of PPR welding machine

    2018/10/26      view:

    1.Open the tool box and take out the bracket.

    2.Take out the host, fixed on the bracket.

    3.Select the corresponding size of the metal fitting, using the octagonal screw to fix the fuse

    4.Connect the power supply to check if the fuser is working.

    5.After the work is turned off, the fuser is still at high temperature and can wait for cooling.