    The installation steps of PPR pipe and fittings

    2018/10/26      view:

    The installation steps of PPR pipe and fittings

    1.Check the operating welding machine and the temperature should be up to 260 ℃ .

    2.Mark PPR pipe the access depth before welding(25mm depth is about 1.5cm)

    3.Parallel the pipe and fitting into the  welding head for 4 seconds' duration 

    4.Pulling out the pipe and fittings after fully heated and keeping a good time after the join.

    5.After the temperature is cooled, the pipe is tightly coupled with the fitting.

    6.To see the fusing effect, we use scissors to cut and the joints are seamless.

    7.In the project pipe and fitting all installed, with the test press  test pressure 48 hours without leakage,  can be used normally.


    CHINA-BASE TUBING INDUSTRY CO.,LTD
    宁波中基惠通集团股份有限公司
    Add: NO.666 TianTong South Road, Yinzhou district, Ningbo, China
    Website: www.cb-tubing.com   
    E-mail : sales@cb-tubing.com  
    Skype:sales@cb-tubing.com  / 86 18786788915  
    Q  Q:  1004498201
    Mobile: 0086-187 8678 8915
    PVC,PPR,CPVC,PE,PP pipe, PVC ball valve, PP compression fitting, PVC fitting, plastic water faucet Water Pipes, PVC female adaptor, PE HDPE PIPES AND FITTINGS, PVC PRESSURE FITTINGS WITH GASKET, VALVES, CPVC PRESSURE PIPES AND FITTINGS, PP COMPRESSION FITTINGS, VALVES AND FILTERS